Essential Guides, Contracts & Checklists
Everything you need to prepare for a successful house relocation. Download our official terms and conditions, pre-move checklists, and site access guides.

Download Client Guides & Checklists
Click any document below to view or download the official PDF guide.
Relocation Contract Terms & Conditions
Full relocation contract agreement covering owner responsibilities, contractor obligations, quotes, risk allocation, and legal terms.
Client Relocation Summary Guide
A plain-language summary of contract key points including pricing, deposits, variations, site readiness, and insurance.
Pre-Move Confirmation Checklist
Required pre-move confirmation form to verify consents, site access, service disconnections, asbestos clearance, and insurance.
After Relocation — What to Expect
Expected settling effects (minor wall cracking, door alignments) and post-move owner finishing responsibilities.
Damage to Driveways, Paths & Surfaces
Guidelines regarding heavy transport machinery weight limits on concrete, asphalt, lawns, and accessway protection.
Piling & Foundations Information
Explaining why piling pricing is an estimate until soil conditions, ground engineering, and council plans are finalized.
Professionals Involved in House Relocation
A breakdown of roles for contractor, designer, engineer, surveyor, council, builder, electrician, plumber, and asbestos specialist.
Roll & Skate Service & Site Preparation
Requirements, clearance maneuverability, and site preparation for tight-access Roll & Skate house positioning.
Key Relocation Information & Owner Guide
Below is an overview of what to prepare before, during, and after your house relocation project.
Owner Responsibilities Prior to Move
- Council Consents: Obtain all building consents and provide stamped plans to the contractor prior to start.
- Site Preparation: Clear access routes, remove overhanging trees, fences, steps, concrete, and asbestos.
- Service Disconnections: Ensure all power, gas, water, and telecom lines are properly disconnected by licensed tradespeople.
- Insurance: Maintain comprehensive building and transit insurance for your structure at all times.
Driveways, Paths & Normal Settlement
- Heavy Equipment: House moving rigs exert immense weight. Cracking of asphalt, concrete, or garden rutting can occur on non-reinforced surfaces.
- Normal Movement: Minor interior wall/ceiling hairline cracking or window/door alignment adjustments are expected outcomes of structural relocation.
- Post-Move Finishing: Post-relocation weatherproofing, cosmetic plaster repairs, and service reconnections are arranged by the owner.
Piling & Foundation Costing
Piling quotes remain estimates until final soil tests, foundation plans, and structural engineer specifications are complete. Ground conditions (soft soil, rock, or deep fill) may require variations in pile length or pile type.
Professionals Required for Relocation
A successful move requires teamwork between the Relocation Contractor, Architectural Designer, Structural Engineer, Site Surveyor, Local Council Inspectors, Licensed Electrician, Plumber/Drainlayer, and Asbestos Removalist (if applicable).
Questions About Contract Terms or Site Preparation?
Speak directly with Joel or Tania to clarify contract scope or schedule site checks.